Frick renovation opened more of its historic home to visitors
The museum returned to Fifth Avenue in April 2025 with additional galleries and public rooms.

News report
The Frick Collection reopened its Fifth Avenue home in New York on April 17, 2025, following a multi-year renovation. The project expanded public access within the historic residence while renewing the museum and its art research library.
The institution’s building fact sheet records 30 percent more space for collection display and exhibitions. A series of rooms on the original residence’s second floor opened as permanent-collection galleries, adding spaces visitors had not previously been able to explore.
The work also created a dedicated education room and a 218-seat auditorium. New exhibition rooms, a public café and a connection between museum and library broadened the ways the building could accommodate visits, learning and public programmes.
Accessibility improvements included ramps, upgraded elevators and restrooms. Behind the galleries, new conservation facilities and renewed heating, cooling, lighting and electrical systems formed part of the same project. These less visible changes supported the building and collection as well as the visitor experience.
The museum’s anniversary timeline confirms the April 2025 return to its original home. The project combined additional public rooms with work on circulation, building systems and conservation facilities. That mix expanded the ways the collection could be displayed and studied while improving the support spaces needed to operate the historic building. Education and performance facilities also gave the renewed museum room for activities beyond viewing the collection.

